![](https://SOULREST.ORG/image/175.jpg)
WEIGHT: 46 kg
Breast: Large
One HOUR:70$
NIGHT: +30$
Services: Sex vaginal, Cum in mouth, Massage, Pole Dancing, Pole Dancing
Swissgrid was commissioned to connect the Nant de Drance pumped storage power plant to the Swiss extra-high-voltage grid. This task has been complete since 1 April Construction of the kV line connecting the Nant de Drance power plant to the electricity grid began in It took almost two years of work before the extra-high-voltage cables installed in the 2. This technological feat was made possible thanks to the specific geological conditions present at this exact location in the Rhone plain.
Mission accomplished for Swissgrid: up to now connected by a provisional line, the Nant de Drance pumped storage power plant, one of the most powerful in Europe with a storage capacity of 20 million kWh, is now definitively connected to the electricity transmission grid. Hydropower plays a major role in the energy revolution. One of these projects is the kV line Chamoson โ Chippis which will be commissioned in fall The extra-high-voltage line connecting the Nant de Drance pumped storage power plant to the electricity transmission grid consists of three substations and three kV line sections as follows:.
This website uses cookies. By continuing to use this website you agree to the use of cookies. More information can be found in the privacy policy or the legal information.
The Nant de Drance power plant is definitively connected to the extra-high-voltage grid Swissgrid was commissioned to connect the Nant de Drance pumped storage power plant to the Swiss extra-high-voltage grid. The power plant is now definitively connected to the extra-high-voltage grid Mission accomplished for Swissgrid: up to now connected by a provisional line, the Nant de Drance pumped storage power plant, one of the most powerful in Europe with a storage capacity of 20 million kWh, is now definitively connected to the electricity transmission grid.
The Nant de Drance connection in brief The extra-high-voltage line connecting the Nant de Drance pumped storage power plant to the electricity transmission grid consists of three substations and three kV line sections as follows: The Nant de Drance switching substation located inside the main cave, that has been in operation since Its role is to connect the power plant to the first section of the line that links it to the electricity transmission grid.